Independent app. FareBack is made by Kodfu Bilisim. It is not affiliated with or endorsed by any train company, National Rail, Network Rail, Rail Delivery Group, Great British Railways or the Department for Transport. You submit every claim yourself; the train company decides whether to pay.
Train companies › West Midlands Railway and London Northwestern Railway
West Midlands Railway and London Northwestern Railway Delay Repay: how to claim for a late train
West Midlands Railway and London Northwestern Railway pay Delay Repay when your train arrives at least 15 minutes late (DR15). Claim within 28 days of your travel date. Here is how much you get, how to claim and what to do if WMR and LNR says no.
Check my WMR and LNR train in FareBack
WMR and LNR at a glance
- Scheme
- DR15: Delay Repay from 15 minutes late
- Claim window
- Within 28 days of your travel date
- Automatic claims
- One-click Delay Repay, for some tickets
- Account needed
- No. An account is optional and saves your season ticket details.
- Claim online
- WMR and LNR claim form (for London Northwestern Railway, use its own claim form) · WMR and LNR’s Delay Repay page
- Complaints
- WMR and LNR complaints and contact
Checked 28/11/2026 on West Midlands Railway and London Northwestern Railway’s own pages (sources below). Rules can change: the claim form shows the current ones, and WMR and LNR makes the final decision.
West Midlands Railway and London Northwestern Railway run local trains across the West Midlands (West Midlands Railway) and trains from London Euston to Northampton, Birmingham, Crewe and Liverpool (London Northwestern Railway). FareBack is an independent app, not affiliated with West Midlands Railway and London Northwestern Railway.
How much WMR and LNR pays
The delay is measured at the station where your journey ends, against the timetable in force that day. The percentages are of the price you paid.
| Arrival delay | Single ticket | Return ticket (one way delayed) |
|---|---|---|
| 15 to 29 minutes | 25% | 12.5% |
| 30 to 59 minutes | 50% | 25% |
| 60 to 119 minutes | 100% | 50% |
| 120 minutes or more | 100% | 100% |
Example. You paid £24.60 for a single and your WMR and LNR train reached your destination 34 minutes late: 50% of the fare, £12.30. With a £48.00 return and only the way home 34 minutes late: 25% of the return fare, £12.00. An hour late on a single: the whole £24.60 back.
WMR and LNR Delay Repay calculator table
What a delay is worth on a £25.00 single and an annual season. Scale it to your fare: a £50 single pays twice these amounts. The season column uses one journey’s value (£4,640 ÷ 464 = £10.00); for 120 minutes or more some companies pay two journeys, see season tickets below.
| Arrival delay | £25.00 single | Annual season £4,640, per journey |
|---|---|---|
| 15 to 29 minutes | £6.25 | £2.50 |
| 30 to 59 minutes | £12.50 | £5.00 |
| 60 to 119 minutes | £25.00 | £10.00 |
| 120 minutes or more | £25.00 | £10.00 |
More on the bands and how they compare: Delay Repay explained.
Does WMR and LNR pay automatically?
One-click Delay Repay. Only for Advance Single tickets bought through your West Midlands Railway or London Northwestern Railway account on the website or app. If you are 15 minutes or more late, you get an email the day after travel; clicking its link submits the claim. Not for other tickets or tickets bought elsewhere.
Anything it does not cover, you claim yourself.
How to claim from WMR and LNR, step by step
- Note the train you planned to catch, its scheduled arrival and the time you really arrived. Claims are for the train you intended to use, even if you caught a later one.
- Check the delay against the table above, at the station where your journey ended.
- Get your ticket evidence ready (list below).
- Open WMR and LNR’s claim form (for London Northwestern Railway, use its own claim form) and enter the journey, the delay and your ticket.
- Choose how to be paid and submit. Keep the claim reference.
- Watch for the answer. If it is refused or less than you expected, challenge it (see below).
Postal claims: Yes: each brand has its own form, from staffed stations or as a download (West Midlands Railway: Freepost WEST MIDLANDS RAIL DELAY REPAY).
What you need
- A photo or screenshot of each ticket with its ticket number (all parts of a split ticket)
- Smartcard or Swift card number
- Oyster or contactless: a TfL statement
- Receipts and booking emails are not accepted unless the ticket number is visible
How WMR and LNR pays: Credit or debit card, bank transfer (BACS), PayPal, National Rail vouchers or a donation to Birmingham Children's Hospital Charity. Paid within 14 days of the decision.
Season tickets on WMR and LNR
Both brands value a day's travel at the season price divided by 8 return journeys (Flexi Season), 5 (weekly), 20 (monthly) or 232 (annual), and pay 12.5%, 25%, 50% or 100% of it. That is the same as 25%, 50%, 100% or 200% of a single journey valued at the price divided by 16, 10, 40 or 464.
Example. An annual season costing £4,640 gives a journey value of £4,640 ÷ 464 = £10.00. Arriving 20 minutes late pays 25% of that, £2.50; 34 minutes late pays 50%, £5.00. Small amounts, but a commuter delayed twice a week has around 90 claims a year.
More on season ticket Delay Repay and strike days.
Why WMR and LNR claims get rejected
- You claimed on the wrong brand's form: West Midlands Railway and London Northwestern Railway have separate claim forms, so use the one for the train that delayed you.
- You sent a receipt or booking email without the ticket number.
- You gave the train you actually caught instead of the one you planned to catch. The National Rail Conditions of Travel (33.1) ask for the train you intended to use.
- The claim arrived after the deadline.
- The delay at your destination was under the threshold. It is measured against the timetable in force that day, so a published engineering-works timetable is the baseline, not the normal one (Conditions of Travel 32.1).
- The ticket image does not show what the company needs, such as the ticket number, journey and price.
- The journey was already claimed, including by an automatic claim.
If you think the decision is wrong, ask WMR and LNR to review it with your evidence (WMR and LNR complaints and contact). Then follow our step-by-step challenge guide (with a letter you can copy) and, if needed, the Rail Ombudsman.
Good to know about WMR and LNR
- You can appeal a decision within one month, through the claim site.
- Extra costs such as a taxi, hotel or refreshments after a delay of 60 minutes or more go to Customer Relations.
How FareBack helps with WMR and LNR claims
- Add a journey and FareBack checks your exact WMR and LNR train with live National Rail data once it is due.
- It applies WMR and LNR’s threshold and bands and shows an estimate, such as “about £6.20”. WMR and LNR makes the final decision.
- Your Claim Pack has every detail the form asks for, with copy buttons, your ticket photo and a link to WMR and LNR’s claim page. You submit it yourself in about a minute.
- Each result shows its evidence: the data source, when it was checked, the train’s identity and planned against actual times, and you can save a Delay evidence PDF.
- Every claim gets a dated record. If WMR and LNR rejects, underpays or ignores it, FareBack writes your challenge letter citing the National Rail Conditions of Travel and reminds you when a reply is due and when you can go to the Rail Ombudsman.
WMR and LNR Delay Repay questions
Is WMR and LNR DR15 or DR30?
It is DR15: West Midlands Railway and London Northwestern Railway pays from 15 minutes late. The amounts are in the table above. Checked on WMR and LNR’s own pages on 28/11/2026.
How long do I have to claim from WMR and LNR?
Claim within 28 days of your travel date. Claiming within a few days is easiest: you still have the ticket and know which train you planned to catch.
Does WMR and LNR pay compensation automatically?
One-click Delay Repay: Only for Advance Single tickets bought through your West Midlands Railway or London Northwestern Railway account on the website or app. If you are 15 minutes or more late, you get an email the day after travel; clicking its link submits the claim. Not for other tickets or tickets bought elsewhere.
I bought my ticket from another website. Who do I claim from?
From the train company whose train delayed you, not the website or app that sold the ticket. If your journey used several companies, you can send the claim to any of them and it must pass it on to the one responsible (National Rail Conditions of Travel 32.1). Refunds for journeys you did not make are different: those go to the retailer.
What if WMR and LNR rejects or underpays my claim?
Ask WMR and LNR to look again, with your evidence, then make a complaint. Train companies should usually give a full response within 20 working days. If you are still unhappy after its final response, or 40 working days have passed, take it to the Rail Ombudsman, which is free. See how to challenge a rejected claim.
Where these facts come from
Read on 28/11/2026:
- West Midlands Railway Delay Repay (West Midlands Railway and London Northwestern Railway)
- London Northwestern Railway Delay Repay (West Midlands Railway and London Northwestern Railway)
- Complaint handling procedure (West Midlands Railway and London Northwestern Railway)
- National Rail Conditions of Travel (edition from 30/07/2026)
West Midlands Railway and London Northwestern Railway sets its own rules and makes the final decision on every claim. This page is general information, not legal advice.
Popular WMR and LNR commutes
- Milton Keynes to London Euston Delay RepayAvanti West Coast and London Northwestern Railway to Euston
- Birmingham to London Delay RepayAvanti West Coast and London Northwestern Railway from New Street to Euston; Chiltern Railways from Moor Street and Snow Hill to Marylebone
Other train companies
- Transport for WalesDelay Repay from 15 minutes late
- Avanti West CoastDelay Repay from 15 minutes late
- All 26 train companiesThresholds, deadlines and claim links
Let FareBack watch your trains
Add a journey or your whole commute and FareBack checks your exact train with live National Rail data once it is due. If you can claim, you see the delay, the train company’s rule, an estimate and the evidence behind it, and your Claim Pack is ready: every detail with a copy button and a link to the right claim form. If the claim is rejected, underpaid or ignored, FareBack writes your challenge letter and tracks the dates to the Rail Ombudsman. You submit everything yourself, and every penny goes to you.
Free: 30 journeys a month, Claim Packs, delay evidence with a PDF, a dated record of every claim, challenge letters with reminders, and an offline Delay Repay calculator with claim links for every train company.
FareBack Pro, £1.99 a month or £12.99 a year (7-day free trial on annual): your commute checked every travel day, the full 28-day look-back, season ticket maths, journeys with changes, split tickets and missed connections, a monthly reliability report, unlimited journeys and claim history export. Prices include VAT.
Android now; iPhone version not yet available. For train journeys in Great Britain. FareBack never takes a cut.


