FareBackTrain delay claims and rail passenger rights

Train late? FareBack checks your saved journeys against National Rail data, tells you what you can claim and gets your Delay Repay claim ready. Free to use.

Get it on Google Play

Independent app. FareBack is made by Kodfu Bilisim. It is not affiliated with or endorsed by any train company, National Rail, Network Rail, Rail Delivery Group, Great British Railways or the Department for Transport. You submit every claim yourself; the train company decides whether to pay.

Split tickets and Delay Repay: yes, you can claim

Split ticketing, buying two or more tickets that together cover one journey, is allowed on National Rail. If the train is late, you claim Delay Repay for the whole journey to your destination, sending every ticket. Here is how it works and how to handle a refusal.

Checked 28/11/2026 against the National Rail Conditions of Travel (edition from 30/07/2026) and train company pages.

Split tickets are allowed

The Conditions of Travel (14.2) say you may use a combination of two or more tickets for a journey, as long as the trains you use call at the station where you change from one ticket to the next. You do not have to get off there. A split at a stop where the train only picks up or only sets down passengers is not valid, and some tickets cannot be combined.

How Delay Repay works with split tickets

Example

You travel Leeds to London on two Advance tickets, split at Doncaster, costing £22.00 and £38.00. The train is 40 minutes late into London on a DR30 company. At 50% of each ticket, worked out ticket by ticket: £11.00 + £19.00 = £30.00, the same as 50% of the total here. Claim once, uploading both tickets.

If a split-ticket claim is refused

Some company wording can be read against split tickets. The GTR companies (Southern, Thameslink, Great Northern and Gatwick Express) say missed connections are paid only when enough time was left and you hold a “through” ticket covering the entire journey. Read with Conditions of Travel 14.2, a valid set of split tickets does cover the entire journey. If you are refused:

  1. Reply with every ticket and the planned trains, and point to Conditions of Travel 14.2 (combinations of tickets are valid) and 33.1 (compensation for a journey made on a ticket or tickets valid for the whole journey).
  2. If the company keeps refusing, make a formal complaint and, after its final response or 40 working days, go to the free Rail Ombudsman.

Our rejected claim guide has a letter you can copy.

Split ticket questions

Can I claim Delay Repay with split tickets?

Yes. Split tickets are a valid way to travel (National Rail Conditions of Travel 14.2). Claim for the delay at your final destination and upload every ticket.

Is the delay measured at the split station?

No. It is measured at the station where your journey ends.

Do I claim on each ticket separately?

Make one claim for the journey and include every ticket. Some companies, such as South Western Railway, then work out the amount ticket by ticket and add it up.

Let FareBack watch your trains

Save a journey and FareBack checks how late the train really arrived, using National Rail data, after it is due. If you can claim, you see the delay, the train company’s rule and an estimate, and your Claim Pack is ready: every detail with a copy button and a link to the right claim form. You submit the claim yourself, and every penny goes to you.

Free: up to 30 journeys a month checked, Claim Packs, reminders before the 28-day window closes, a claim tracker and a Delay Repay calculator for single, return and season tickets.
FareBack Pro, £1.99 a month or £12.99 a year (7-day free trial on annual): your commute checked every travel day, season ticket maths done for you, a 28-day look-back with a Claim Pack for every delay you can still claim, unlimited journeys and claim history export. Prices include VAT.

Get it on Google Play

Android now; iPhone version not yet available. For train journeys in Great Britain. FareBack never takes a cut.

Where these facts come from

Read on 28/11/2026. Each train company makes the final decision. General information, not legal advice.